Sunday, August 28, 2011

Semi-Recent House Projects


Thanks to my handy contractor, Dennis, we now have more master bathroom storage, 3 new ceiling fans, and a newly textured ceiling (the last one in the house) in our other upstairs bathroom.  The work in the other bathroom was a result of the job K-Bar did for us, which I'm still not happy about.  Dennis had to fix the ceiling cracks, patch the wall, texture the ceiling, and paint nearly the entire bathroom.  All that work and it cost us no small amount.  Thankfully, Dennis always does great work, and we're always happy with the results.  I will definitely call him next time before looking elsewhere.

The fans have been nice this summer since it's been so hot, and the boys have gotten a kick out of them.  My only complaint is that I keep bumping into the chain with my head.

Something else I did all by myself was to mount one of those cheap push lights on the bottom of the new bathroom cabinet for those late nights visit.  That way, there's no blinding light experience for the visitor.









Posted by Picasa